Some of Our Projects




✓  Gas train construction for Nestle foods, Shagamu–2 Megawatts Gas Generator Set 2012 

✓  Gas train construction to 16 burner furnace, Dolphin Steel Ewekoro2013

✓  Construction of 600m steel spurline for Rider glass, Agbara2012

✓  Gas Equipment supply to BUA Pasta Limited, Lagos 2013 

✓  Gas Equipment supply to OK Foods Limited, Lagos2013

✓  Gas Equipment supply to Negrispower Limited, Lagos2013
     ✓  Gas Equipment supply to Green fuels       Limited Ota, Ogun State2013

✓  Gas regulators supply to Clarke Energy for GE Gas engines at Chi Farms Ibadan, Oyo State 2014

✓  CNG gas station re-modification work at Midgal Industries Abeokuta, Ogun State 2014

✓  Supply and installation of 3 units of gas train for boilers and generators use at NosakFarms, lagos 2014

✓  CNG PRU installation work for Green fuels gas station at SumalFoods Ibadan, Oyo State 2015

✓  Gas Equipment supply and gas line construction for Aggreko at Beta Glass, Agbara 2017  
     ✓  Supply and installation of 2 Units of       gas train to generators used at Karamu       Plastics, Ogba Lagos. 2018

✓  Design, Procurement and construction of gas train and line for Aggreko Genetors used at Deli Foods, Lagos 2018

✓  Design and Supply of Turn Key Gas train for Mantrac 2018

✓  Construction of High Pressure and Low pressure Gas Line for Green Fuel CNG PRU used at PAU, Ibeju Lagos. 2018

✓  Gas Equipment supply to Green fuels Limited Abeokuta, Ogun State 2018

✓  Design, Procurement and construction of gas train and line for Aggreko Genetors used at UAC Foods, Lagos 2018
     ✓  Design, Procurement and          construction of gas train and line for  Aggreko Genetorsused at GZ industries,  Agbara2018

✓  Construction of High Pressure and Low pressure Gas Line for Green Fuel CNG PRU used at CHI Farms, Ibadan. 2019
     ✓  Natural Gas Compression Plant- “Mother-station”. [Engineering, Procurement and Construction of the internal piping, PRMS, and Scrubber ]
     ✓  6” – 10” 2.3KM PIPELINE.
[LAYING, INSTALLATION AND COMMISSIONING OF 2.3KM PIPELINE]

✓  6MMSCFD Natural Gas Compression Plant- “Mother-station”. [Engineering, Procurement and Construction of the internal piping with 6” SCH80 Pipe before the compressor and 3” SCH160 after the compressor ]
     ✓  Natural Gas Compression Plant- “Mother-station”. [Engineering, Procurement and Construction of the internal piping with 12” and 6” Pipes. ]